Icon representing Australia Australia
New Zealand New Zealand
New Zealand New Zealand
Icon representing Australia Australia
ASX Share Price:
  • About us
    • About us

      Downer is the largest provider of integrated services in New Zealand and employs more than 10,000 people from Kaitaia to Invercargill.

      Learn more
      • Overview
      • Board of Directors
      • Company history
      • Our Tikanga
      • Our Expertise
      • Executive Leadership Team
      • Our Purpose
      • Downer in New Zealand
      • Our Policies
      • Our Culture
      • Overview
      • Our Expertise
      • Downer in New Zealand
      • Board of Directors
      • Executive Leadership Team
      • Our Policies
      • Company history
      • Our Purpose
      • Our Culture
      • Our Tikanga
  • What we do
    • What we do

      Downer is a leading provider of integrated services in Australia and New Zealand.

      Learn more
      • Sectors
      • Transport
      • Energy & Utilities
      • Facilities
      • Defence
      • Sectors
      • Transport
      • Energy & Utilities
      • Facilities
      • Defence
  • Investors
    • Investors

      View our latest ASX announcements as well as financial reporting, key dates and shareholder information.

      Learn more
      • Home
      • Results centre
      • ASX announcements
      • Webcasts and presentations
      • Share price
      • Key dates
      • Corporate governance
      • Annual General Meetings
      • Shareholder information
      • Dividend information
      • Other information
      • Home
      • Share price
      • Shareholder information
      • Results centre
      • Key dates
      • Dividend information
      • ASX announcements
      • Corporate governance
      • Other information
      • Webcasts and presentations
      • Annual General Meetings
  • News and media
    • News and media

      Keep updated with our latest news.

      Learn more
      • Latest news
      • Media contact
      • Whitepapers
      • Downer podcasts
      • Latest news
      • Media contact
      • Whitepapers
      • Downer podcasts
  • Sustainability
    • Sustainability

      We understand the importance of having a responsible and forward-thinking approach to sustainability.

      Learn more
      • Our Approach to Sustainability
      • Social Impact
      • Safety, health and wellbeing
      • Sponsorships
      • Environment
      • Case studies
      • Our Approach to Sustainability
      • Safety, health and wellbeing
      • Environment
      • Social Impact
      • Sponsorships
      • Case studies
  • People and careers
    • People and careers

      Our people are at the heart of everything we do.

      Learn more
      • Home
      • Our people
      • Downer benefits
      • Life at Downer
      • Current opportunities
      • Own Respect
      • Inclusion and belonging
      • Report a concern
      • Home
      • Life at Downer
      • Inclusion and belonging
      • Our people
      • Current opportunities
      • Report a concern
      • Downer benefits
      • Own Respect
  • Contact us
    • Contact us

      Downer has over 120 sites across New Zealand with our head office based in Auckland.

      Learn more
      • Contact us
      • Supply to Downer
      • Contact us
      • Supply to Downer
We have detected you are accessing the site from
Do you want to be redirected to the Downer site?
Go to Downer
Stay on  Site
Are you sure you want to leave this page?
This link is taking you to a site outside of Downer
Go to Site  Stay on Site
Embedded Video

Downer Case Study

Northern Network

16/05/2022

Northern Network

 

The Northern Network Transportation Project (NNTP) was established to future proof George Bolt Memorial Drive (the northern access to Auckland Airport) to prepare for the next thirty years of predicted traffic growth for Auckland International Airport. Downer tendered for the project in early 2019.

The scope of the contract included widening over a kilometre of George Bolt Memorial Drive to a minimum of three lanes in each direction, construction of a three lane international terminal exit road, upgrades to three signalised intersections on George Bolt Memorial Drive, construction of new connector roads, and upgrades to several existing roads within the northern road network. Works included new storm-water services, full depth pavement construction, associated road marking, low, medium and high voltage utility ducts, street-lighting, kerbing, a shared path network and extensive landscaping works. 

Challenge

With a traffic count of over 100,000 vehicles per day, one of the key contract requirements was to maintain two lanes in both directions on George Bolt Memorial Drive, during construction of the new road pavement. 

As the Tom Pearce Drive intersection is the most heavily congested intersection at the airport, the site team were required to provide access to both the Domestic and International terminal at all times. The intersection had to be fully reconstructed with a new pavement of up to 760mm in depth at tender stage. This risked close contact with existing shallow services and potential cost and time implications from having to protect and/or lower the existing services. The traffic management constraints meant that the intersection pavement had to be constructed in nine sections, which could have resulted in an extended construction period and the potential for a poor quality pavement given the number of joints required.

Solution

The team maintained two lanes in both directions on George Bolt Memorial Drive during construction of the new road pavement, to limit disruption for the public and businesses accessing Auckland Airport. Typical travel times were generally less than five minutes, with the exception of significant traffic incidents outside of our control.

EME2 asphalt, designed to be longer lasting than traditional asphalt was the preferred option for Auckland  Airport, as it offered enhanced resistance to rutting and a reduced overall pavement depth and minimizing potential contact with existing shallow services. The EME2 solution was used for two out of three intersections on George Bolt Memorial Drive. 

We proposed a 'Super Weekend' model which would significantly reduce the number of phases of pavement construction and enable us to complete the majority of the intersection pavement construction in a single weekend, from Friday evening to Monday morning. This saved up to seven weeks of traditional pavement construction works.

Outcomes

The asphalt pavement consistently provided better NAASRA (roughness measurement) results than the specified requirement of 50. 

Falling weight deflectometer (FWD) surveys also confirmed that the pavement life of 25 years had been exceeded across the whole project, providing Auckland Airport with high quality, low maintenance and long-life pavements.

Due to the Super Weekend being so successful, the concept has been extended to works on the wider Auckland road network on our Road Corridor Maintenance.

Added value

The EME2 solution reduced overall pavement depth, risk from encountering shallow services and reduced pavement construction duration, due to elimination of a cement treated base course layer.

 



  • Copyright © 2025 Downer Group
  • Privacy Policy
  • Sitemap
  • Disclaimer
  • Contact us
Image Preview